ReHAB – Simonyi Conference


ReHAB-150

Simonyi Conference


Mission Status

Live telemetry streamed. Picture downloaded. Software malfunction at 3600m (11800ft). Telemetry and pictures stored up to 10000m (33000ft). Recovered by civilian reports.

COMPLETED


Launch Date/Time: 13:00(UTC) 17.04.2015.

Launch sight

Recovery Date/Time: 8:00(UTC) 18.04.2015.

University of Technology and Economics of Budapest Building “I”


Lead Flight Director

Chase Team Leader

Bence Góczán

Máté Kurbucz


Radio Frequency

Callsign

433MHz band

HA5MRC


Posted in Fellövések, Hírek.